Guide
Can You Sell a House With an LADBS Order to Comply? A Guide for San Fernando Valley Owners
Can You Sell a House With an LADBS Order to Comply? A Guide for San Fernando Valley Owners
An Order to Comply from the Los Angeles Department of Building and Safety (LADBS) usually shows up after a complaint or an inspection. It might cite a garage that was converted into a bedroom, a room addition with no permit on file, a patio cover built too close to the property line, or work started without a permit. The order gives you a compliance date, and it comes with fees.
If you were already thinking about selling, or the order is what’s pushing you to sell, the first question is usually whether you can sell with it still open.
Generally, yes. (We cover the broader picture in our guide to selling a house with code violations.) An Order to Comply doesn’t stop you from selling. But it doesn’t go away when you sell, either. Below is what the order means, what happens if you miss the deadline, and how the order affects each way you might sell.
Not legal advice. This explains how LADBS orders generally work in the City of Los Angeles. Read your actual order, talk to the inspector named on it, and get advice from a real estate attorney before you sell a property with an open enforcement case.
First, is your house actually in the City of Los Angeles?
Much of the San Fernando Valley is inside the City of Los Angeles: Van Nuys, North Hollywood, Sherman Oaks, Studio City, Encino, Reseda, Northridge, Granada Hills, Sylmar, Pacoima, Sun Valley, Panorama City, Canoga Park, Winnetka, Chatsworth, Tarzana, Woodland Hills, and more. LADBS handles building code enforcement in those neighborhoods.
Burbank, Glendale, the City of San Fernando, Calabasas, and Hidden Hills are separate cities with their own building and code enforcement departments. Unincorporated areas are handled by the county. If your order didn’t come from LADBS, the fees and steps below may not apply.
You can confirm your parcel’s jurisdiction and zoning on the city’s ZIMAS site.
What an Order to Comply means
LADBS tells owners who get an Order to Comply to read it carefully and figure out (source):
- which items require a permit,
- how to contact the inspector or the inspector’s supervisor,
- what fees may apply and the penalties for paying late, and
- the appeal procedures.
LADBS also states this plainly:
“The current property owner is responsible for complying with the Order, even if previous owners or tenants have performed the un-permitted work or created the violation.”
That sentence is the key to selling. If you inherited the house or bought it with the garage already converted, the order is still yours to deal with. And once you sell, the next owner takes on that responsibility. That’s why an open order affects price, financing, and which buyers will be interested.
The deadline that triggers the noncompliance fee
Under LAMC Section 98.0411, here’s how the noncompliance fee works:
- LADBS can charge a noncompliance fee if you don’t comply within 15 days after the compliance date on the order (or after any extension).
- For buildings, other structures, open uses, signs, licenses, and equipment, the fee table in that section lists $660.
- You can avoid or delay the fee by filing an appeal or a request for a “slight modification” (an extension) within 15 days after the compliance date. If you appeal, the fee generally can’t be imposed until the appeal is decided.
- If the fee is billed and you don’t pay within 30 days of the notice, the code adds a late charge of two times the fee plus a 50% collection fee, and interest of 1% per month starting on the 60th day after the notice is mailed.
- LADBS can also withhold building permits, licenses, or approvals from the person cited until the fee is paid.
Your order may list other fees too, like an inspection fee, or investigation fees if permits are needed for work done without one. Read the fee section of your own order. Amounts can change, and the order is the document that controls.
Practical takeaway: write down the compliance date and the date 15 days after it. If you’re going to sell before you can finish the work, call the inspector before that second date and ask about an extension.
Your four options
1. Fix it and close the case
LADBS’s bulletin Obtaining Permits to Resolve Orders (P/GI 2023-026) lays out the process:
- Get the property’s records (building permits, plot plans, certificates of occupancy). The bulletin lists a Van Nuys records counter (6262 Van Nuys Blvd) among the LADBS offices. Check current hours before you go.
- Get zoning information. The bulletin warns that some work can’t be permitted at all because of parking, height, density, use, or setback rules, and some projects need Department of City Planning approval.
- See if the work qualifies for an Express Permit (no plans required). The bulletin’s examples include non-structural residential rehab, same-size window and door changes, and kitchen and bath remodels without structural changes.
- Have plans drawn for everything else. The bulletin specifically lists garage conversions, creating or removing dwelling units, additions, and structural work as items that need plans.
Some items can be fixed without a permit by removing the unpermitted construction and restoring the building to its approved condition, as long as that doesn’t affect structural integrity. Ask the inspector whether that’s an option for your order.
Once the work is done, contact the inspector for a compliance inspection.
When this makes sense: the violations are minor, you have the cash and time, and you want to sell to the widest pool of buyers.
2. Ask for more time (slight modification) or appeal
If you can’t finish by the compliance date, LAMC 98.0411 points to the appeal and slight-modification procedures in LAMC 98.0403.1. The request generally has to be filed within 15 days after the compliance date. If you think the order is wrong (for example, the work actually was permitted), an appeal is how you challenge it. Bring your permit records.
When this makes sense: you plan to fix the problem but need more time, or you’re selling and want to keep fees from stacking up while escrow is open.
3. List it with an agent and disclose the order
You can list a house with an open order. Be ready for a few things:
- Disclosure. California requires sellers to give buyers written disclosures about the property’s condition. The Real Estate Transfer Disclosure Statement is set out under Civil Code 1102.6. An open enforcement order is the kind of fact you should put in writing. Ask your agent or attorney exactly how.
- The Residential Property Report. In the City of Los Angeles, the seller of residential property generally has to get a Residential Property Report from LADBS and deliver it to the buyer (LAMC 96.300). The page lists the fee as $70.85 per report. It reports the city’s records on the property, so any gap between what’s permitted and what’s actually built is likely to surface.
- Financing and appraisal. Lenders and appraisers may raise questions about square footage or rooms that don’t match permit records. Buyers using loans may ask you to fix things first or to cut the price.
- The buyer takes over the order. Expect that to show up in offers.
When this makes sense: the house is otherwise in good shape, the violation is limited, and you have time for a normal escrow.
4. Sell as-is to a buyer who takes on the order
Some buyers, including cash buyers like us, will purchase a house with an open Order to Comply and handle the permits, removal, or restoration after closing. You skip the plans, contractors, and inspections. The price will reflect the cost and risk of the work the buyer is taking on.
When this makes sense: (see also selling a house with unpermitted additions) - The fix is expensive, or might not be permittable under current zoning. - You inherited the problem and don’t want to manage a construction project. - You’re facing fee deadlines, carrying costs, or another life event (divorce, a move, probate) and want a set closing date. - There are other issues as well, like deferred repairs, tenants, or a house full of belongings.
Even in an as-is sale, you still disclose the order. As-is means you aren’t fixing it. It doesn’t mean you keep it quiet.
What to gather before you talk to any buyer or agent
- A copy of the Order to Comply, including the case number, inspector name, and compliance date.
- Any fee invoices from LADBS.
- The house’s permit history and certificate of occupancy, if you have them, plus a ZIMAS printout.
- Notes on what was built and when, and by whom if you know.
- Whether the unpermitted space is rented out. If a tenant lives in it, talk to an attorney before you change anything, because tenant protections may apply.
With these in hand, an agent can give you a realistic list price and a buyer can make a firm offer.
How Sell Us SoCal handles houses with LADBS orders
We buy houses as-is in the San Fernando Valley and across Los Angeles, including houses with open Orders to Comply, unpermitted garage conversions, and additions. Send us a copy of the order and the address. We’ll look at what the order requires and make a no-obligation cash offer that accounts for it, and you can compare that against fixing the house or listing it. You pick the closing date that works with your situation, and the order gets disclosed in writing in escrow.
Get your no-obligation cash offer or call 818-390-2301.
Related pages: - Selling a house in Van Nuys - Selling a house in North Hollywood - Selling a house with code violations or liens - Selling a house with unpermitted additions - Got code violations in Sun Valley? - Selling a house with unpermitted additions in Los Angeles
FAQ
Does an LADBS Order to Comply go away when I sell the house?
No. LADBS says the current owner is responsible for complying, even if a previous owner or tenant did the work. After you sell, the order becomes the new owner’s responsibility. That’s why it affects price and needs to be disclosed.
What happens if I miss the compliance date?
Under LAMC 98.0411, LADBS can charge a noncompliance fee ($660 in the fee table for buildings) if you haven’t complied within 15 days after the compliance date, unless you file an appeal or slight-modification request in that same 15-day window. Unpaid fees pick up a late charge, a collection fee, and monthly interest, and LADBS can withhold permits until they’re paid.
Can I get more time to fix the violations?
You can ask for a “slight modification,” basically an extension, under the procedures in LAMC 98.0403.1. File it within 15 days after the compliance date. Your inspector and the order itself explain how.
Do I have to fix the violations before I sell?
Not necessarily. You can sell with an open order as long as you disclose it. Many financed buyers will want it fixed or a lower price. Cash buyers who buy as-is may take it over.
Is a garage conversion with an Order to Comply legalizable?
Sometimes. LADBS says garage conversions need plans, and zoning rules like parking, density, and setbacks may prevent legalizing some conversions. Others can be restored to a garage. Pull your records and check zoning before you spend money on plans.
My house is in Burbank, not LA. Does this apply?
No. Burbank, Glendale, and the City of San Fernando run their own code enforcement, with different procedures and fees. We buy houses in Burbank and Glendale too. Call 818-390-2301.
Will you buy my house if the city also has open permits or a tenant in the unpermitted unit?
Often, yes. Tell us everything up front: the order, open permits, and occupancy. We’ll tell you plainly whether we can make an offer and how we’d structure it. Send us the details.
Sources
- LADBS, Resolving Orders to Comply and Associated Fees
- LADBS Information Bulletin P/GI 2023-026, Obtaining Permits to Resolve Orders
- LAMC Sec. 98.0411, Non-Compliance Fees
- LADBS, Residential Property Report (LAMC 96.300)
- LADBS Code Enforcement (complaints and compliance)
- City of Los Angeles ZIMAS (zoning and parcel information)
- Cal. Civil Code 1102.6 (Real Estate Transfer Disclosure Statement)